2.4 GW online

clean capacity we run today

Wind and sun,
quietly running whole grid

We develop, build and run onshore wind farms and solar parks for utilities, councils and industry, from the first wind study to decades of steady output.

Wind capacity

1.8 GW

Wind farms

64

CO2 avoided

3.1M t

Why wind and sun

We plan every site around how the wind really blows and where the sun really falls, so every turbine and panel earns its place for decades.

Aerial view of a line of wind turbines along a ridge above a misty river valley at sunrise

Site study

Two years of wind data before one turbine is ordered

Met masts and lidar log every gust on the ridge, then we model output for each turbine spot.

Steady power, day and night

Wind keeps turning after sunset and through winter, filling the hours solar cannot reach.

Two technicians in harnesses on top of a wind turbine nacelle above green fields

Steady power, day and night

Wind keeps turning after sunset and through winter, filling the hours solar cannot reach.

Two technicians in harnesses on top of a wind turbine nacelle above green fields

Storage that smooths the peaks

Grid batteries hold surplus wind and sun, then release it when demand starts to climb.

Storage that smooths the peaks

Grid batteries hold surplus wind and sun, then release it when demand starts to climb.

Solutions

One partner for wind, sun and storage

From a single ridge to a hybrid grid site, we plan, build and run every part of the project in house.

A line of wind turbines across golden moorland at dawn

01

Up to 300 MW per site

Onshore wind

Turbines sited on two years of wind data and built to run for thirty.

Sheep grazing between rows of a solar park on rolling farmland

02

Pairs with wind on one grid link

Solar parks

Ground-mounted arrays that peak at midday, right when wind dips.

White grid battery storage cabinets beside a field with wind turbines behind

03

2 to 4 hour storage

Battery storage

Grid batteries that bank surplus power and release it at the evening peak.

An operations engineer with a tablet walking between wind turbines

04

24/7 control room

Operations

Our engineers watch every turbine, panel and battery for the full life of the site.

A line of wind turbines across golden moorland at dawn

01

Up to 300 MW per site

Onshore wind

Turbines sited on two years of wind data and built to run for thirty.

Sheep grazing between rows of a solar park on rolling farmland

02

Pairs with wind on one grid link

Solar parks

Ground-mounted arrays that peak at midday, right when wind dips.

White grid battery storage cabinets beside a field with wind turbines behind

03

2 to 4 hour storage

Battery storage

Grid batteries that bank surplus power and release it at the evening peak.

An operations engineer with a tablet walking between wind turbines

04

24/7 control room

Operations

Our engineers watch every turbine, panel and battery for the full life of the site.

How it works

From first gust through to first power

Four phases, one team. Each step builds on the last, the way output climbs when a site goes live.

1

Up to 24 months

Wind study

Met masts and lidar log every gust on site before a single turbine is chosen.

1

Up to 24 months

Wind study

Met masts and lidar log every gust on site before a single turbine is chosen.

1

Up to 24 months

Wind study

Met masts and lidar log every gust on site before a single turbine is chosen.

2

6 to 12 months

Design and permits

Turbine spots, roads and the grid link are modelled, then we lead planning and community talks.

2

6 to 12 months

Design and permits

Turbine spots, roads and the grid link are modelled, then we lead planning and community talks.

2

6 to 12 months

Design and permits

Turbine spots, roads and the grid link are modelled, then we lead planning and community talks.

3

12 to 18 months

Build

One team builds foundations, towers, panels and the substation, then connects it to the grid.

3

12 to 18 months

Build

One team builds foundations, towers, panels and the substation, then connects it to the grid.

3

12 to 18 months

Build

One team builds foundations, towers, panels and the substation, then connects it to the grid.

4

30 years

Operate

Our control room watches every turbine and panel around the clock for the life of the site.

4

30 years

Operate

Our control room watches every turbine and panel around the clock for the life of the site.

4

30 years

Operate

Our control room watches every turbine and panel around the clock for the life of the site.

Impact

Clean power you can really measure

Every site sends live output to our control room, so these numbers update as the wind blows.

Clean capacity in operation today

Clean capacity in operation today

Wind farms and solar parks built

Wind farms and solar parks built

CO2 kept out of the air every year

CO2 kept out of the air every year

Homes powered by our sites each day

Homes powered by our sites each day

Projects

Sites already turning

Testimonials

The people who choose to build with us

Sunvane found wind on a ridge two other developers had written off, then brought the whole village along with them.

ML

Mara Lindqvist

Energy lead, Northfold Council

Sunvane found wind on a ridge two other developers had written off, then brought the whole village along with them.

ML

Mara Lindqvist

Energy lead, Northfold Council

Their control room spotted a gearbox fault three weeks before it would have stopped a turbine.

DO

Daniel Okafor

Asset manager, Westbrook Utilities

Their control room spotted a gearbox fault three weeks before it would have stopped a turbine.

DO

Daniel Okafor

Asset manager, Westbrook Utilities

Permits, grid and the community fund: one team handled all of it, on the timeline they promised.

PR

Priya Raman

Head of energy, Calder Foods

Permits, grid and the community fund: one team handled all of it, on the timeline they promised.

PR

Priya Raman

Head of energy, Calder Foods

FAQ

Questions we hear first

Straight answers on timelines, land, grid links and what happens after the ribbon is cut.

How long does a wind farm take from first study to first power?

Most onshore projects take three to five years: about two years of measurement and permits, then twelve to eighteen months of build.

Wind turbines on a grassy hill under a teal dusk sky

Start a project

Have a ridge with wind on it?

Send us the location and a rough size. Within two working days you get a first wind and grid check, free.