All projects

Project 02

Saltmarsh Hybrid

Wind and solar sharing one grid link, so the site keeps exporting clean power day and night.

Wind and solar

Coastal cliffs, Wales

Online 2023

Capacity

186 MW

Technology

Wind and solar

Homes powered

140,000

The story

How we planned and built it

The challenge

The grid could only take one new connection, and the council wanted power that matched evening demand, not just windy afternoons.

Cliff top winds swing hard with the seasons, and the coastal path had to stay open for the whole of the build.

Our approach

We paired nine turbines with a solar array on the same connection, sizing each so that sun covers calm summer days and wind carries the nights and winter.

A shared substation and battery-ready layout means the site can add storage later without a second grid application.

The result

The hybrid site exports power on 340 days a year and a share of every megawatt hour funds the village community trust.

The coastal path reopened with viewing points and signs that explain how the hybrid site works.

Key facts

  • 9 turbines plus 64 MW of solar on one 186 MW connection

  • Exports power on 340 days a year

  • Coastal path kept open for the full build

  • Battery-ready substation for future storage

One connection, two kinds of power. It is the most reliable renewable site we have on our network.

RB

Rhys Bevan

Network planner, Western Grid

Create a free website with Framer, the website builder loved by startups, designers and agencies.